Vietnam proposes 99% tungsten oxide export purity rule
Vietnam’s draft mineral-export circular would require 99% tungsten trioxide in oxide exports, exclude ore and concentrate, and set standards for APT and ferrotungsten.
By Amara Osei
3 min read

What's News
- Vietnam’s draft would require tungsten oxide exports to contain at least 99% tungsten trioxide.
- APT must be crystalline with at least 88.5% tungsten; ferrotungsten must be 70% to 85% tungsten and a true alloy.
- The draft sets no implementation date, excludes ore and unrefined concentrate, and leaves final approval to the prime minister.
- The ministry estimates tungsten resources at 309.41 thousand tons of tungsten trioxide, concentrated in Thai Nguyen.
- Masan reported VND4.35 trillion ($168 million) post-tax profit for January-September 2026; output is 6,000 tons, targeting 8,000 in 2027.
By Amara Osei
Vietnam’s Ministry of Industry and Trade proposes requiring tungsten oxide exports to contain at least 99% tungsten trioxide (WO₃), according to its draft circular on mineral exports.
The ministry’s draft sets no specific implementation date. It also leaves raw tungsten ore and unrefined or unsmelted concentrate outside the proposed export framework.
The ministry said the document updates technical criteria for various tungsten products. The criteria identify and check products, but they do not by themselves permit exports. Final approval rests with Vietnam’s prime minister, who decides which tungsten products and processing levels may be exported from domestic ore.
What would qualify for export?
The ministry’s draft recommends ammonium paratungstate (APT), tungsten oxide, and ferrotungsten for the list of products eligible for export. It leaves ore and concentrate out, the ministry said.
The ministry set three product-specific quality thresholds:
- Tungsten oxide must contain at least 99% tungsten trioxide.
- APT must be crystalline, with at least 88.5% tungsten expressed as tungsten trioxide.
- Ferrotungsten must contain 70% to 85% tungsten by mass and be a true alloy, not a mechanical mixture with ore.
Those rules distinguish the proposed export products from raw ore and concentrate, but they do not settle the final list. A company could meet the technical standard without gaining export clearance. Under the ministry’s proposal, the prime minister determines both which products qualify and how much processing domestic ore must undergo before export.
Why processing at home matters
The ministry said Vietnam already has an industrial processing chain and identified Masan High-Tech Materials, under Vietnamese conglomerate Masan, as a key company. It also said concentrate is used as feedstock for further processing at home.
That leaves the proposed export list focused on APT, tungsten oxide, and ferrotungsten rather than ore or concentrate. It also separates technical eligibility from the prime minister’s decision on what may be exported and at what processing level.
The ministry put Vietnam’s tungsten resources at about 309.41 thousand tons of tungsten trioxide. It said the resources are concentrated in Thai Nguyen province.
Further occurrences are recorded in Tuyen Quang, Thanh Hoa, Quang Ngai, and Lam Dong provinces, the ministry said. The estimate covers the resource base behind the country’s proposed processing and export chain.
What does Masan expect from 2027?
Masan High-Tech Materials reported post-tax profit of VND4.35 trillion ($168 million) for January through September 2026. The figure compares with a loss of VND211 billion in the same period of 2025.
The company also said its current output is 6,000 tons and its target is 8,000 tons in 2027. Orders for 2027 nearly fill planned capacity, Masan High-Tech Materials said.
Masan High-Tech Materials has signed a concentrate-supply cooperation with South Korea’s GB Innovation. That deal gives the company a named overseas supply partner as it works toward the 2027 production target, according to the company’s disclosure.
Neither the ministry’s draft nor Masan’s disclosed figures specify the volume, value, or duration of the GB Innovation cooperation. They also do not say how much of Masan’s 2027 output has been earmarked for export, a question the draft leaves open because the prime minister still controls the eligible list and processing level.
What comes next?
The next procedural step is approval because the ministry’s draft carries no implementation date. The prime minister must decide the export list and required processing level. For Masan, that decision comes against 2027 orders nearly filling planned capacity and an 8,000-ton output target, compared with current output of 6,000 tons.
Source: technode.global
More from Amara Osei
Show full bio
Senior reporter covering companies, deals and strategy in entrepreneurship, startups and venture funding at Business Bearings.
2,422 articles